Chronological progress of HoMerge construction works — foundations, walls, slabs.
HoMerge
2025-12-16
Interior of a house under construction, with partially erected block walls and a ceiling supported by steel props. A poured ceiling slab is visible.
HoMerge
2025-12-16
Interior of a house under construction with a poured slab and walls raised from blocks, supported by props and with a structural column.
HoMerge
2025-12-16
Interior of a house under construction with a poured floor slab, partially built walls, and visible window openings. Scaffolding and a reinforced concrete column stand inside.
HoMerge
2025-12-16
A concrete slab with bolted steel columns; planks laid next to it, indicating preparations for further construction work.
HoMerge
2025-12-16
The interior of a house at the stage of wall construction with concrete blocks and a completed ceiling, with working scaffolding set up. Window openings with protective coverings are visible.
HoMerge
2025-12-16
Inside the house under construction, you can see walls made of blocks with window and door openings; a scaffold stands on the floor.
HoMerge
2025-12-16
Interior of a house under construction: walls built from blocks and a poured floor, with props inside and a makeshift scaffold under the ceiling.
HoMerge
2025-12-16
Erected walls of blocks on the upper storey and the slab made with formwork. View from the scaffolding into the interior of the construction.
HoMerge
2025-12-16
Scaffolding inside the house under construction and a freshly poured concrete floor, with block masonry walls visible around.
HoMerge
2025-12-16
Interior of a house under construction: walls built of hollow blocks and a poured slab/floor, with scaffolding standing in the middle.
HoMerge
2025-12-16
The edge of a poured concrete foundation slab, next to it an excavation with a mound of soil and a fragment of a building wall.
HoMerge
2025-12-16
View of walls built from hollow blocks with a window opening; the construction of the lower storey of the building is underway. On the right, work boards are laid out.
HoMerge
2025-12-16
The walls were erected from blocks, the ceiling at ground-floor level and the window openings are visible. Above the excavation, a wooden footbridge leads to the building.
HoMerge
2025-12-16
Walls made of blocks on the upper level of the building, with visible window openings and scaffolding. A temporary plank footbridge leads to the entrance.
HoMerge
2025-12-16
Masonry walls of a single-family house at the construction stage, with visible window and door openings. A temporary plank footbridge over the excavation leads to the entrance.
HoMerge
2025-12-17
Erected ground floor walls with window and door openings, visible reinforced concrete columns. Below, a plinth of concrete blocks.
HoMerge
2025-12-17
The ground-floor walls of a single-family house have been erected with visible window and door openings, part in formwork for further work. A basement foundation is visible.
HoMerge
2025-12-17
The ground-floor walls have been erected from blocks, with window and door openings prepared. Formwork and reinforcement for the ring beam are being installed on top.
HoMerge
2025-12-17
House construction: ground and first floor walls erected, slab formwork prepared, scaffolding and stored materials on the site. Workers visible at work.