Chronological progress of HoMerge construction works — foundations, walls, slabs.
HoMerge
2025-07-18
Excavation for the foundations completed and piles of earth heaped on the plot of a single-family house construction.
HoMerge
2025-07-24
Leveled construction site with visible tracks from machinery and spread soil, stage of plot preparation.
HoMerge
2025-07-24
On the plot, a freshly piled mound of sand is visible and the ground has been dug up for foundations.
HoMerge
2025-07-31
An excavated construction site with large piles of earth and clearly formed foundation trenches. Earthworks in progress.
HoMerge
2025-08-08
Leveled construction site with an excavation for the foundations of a single-family house.
HoMerge
2025-08-17
Excavated and leveled ground for the foundations of a single-family house, with a clear outline of the future building.
HoMerge
2025-08-17
Leveled construction site with an excavation made and marked-out strips for the house foundations.
HoMerge
2025-08-20
The house’s foundation slab has been poured; fresh concrete and protruding rebar are visible, with the construction site cleared around it.
HoMerge
2025-08-20
Excavation for the house foundations, the visible outline of the future building and piles of earth on the construction site.
HoMerge
2025-08-21
Excavation made for the foundations of a single-family house; the outline and trenches for strip footings are visible on the prepared plot.
HoMerge
2025-08-26
Construction site view: prepared foundations with white insulation and protruding installations, surrounded by excavations for further work.
HoMerge
2025-08-29
Excavation for the foundations on the plot, sand spread out, with an excavator and several workers in the background.
HoMerge
2025-09-02
Excavated and leveled plot area with the outline of the future house foundations marked. Visible earthworks preparing for construction.
HoMerge
2025-09-03
An extensive, leveled construction site with piled-up soil; the area prepared for further foundation work.
HoMerge
2025-09-04
Prepared foundation slab with laid-out reinforcing mesh and formwork at the edges.
HoMerge
2025-09-05
An excavation filled with poured concrete for a house foundation slab, with visible edges and formwork. The initial stage of construction.
HoMerge
2025-09-10
Poured house foundation with low walls and room outlines at the construction site. The prepared slab and the outline of the future walls are visible.
HoMerge
2025-09-15
Masonry foundation walls of a single-family house stand in the excavation, the outline of the building is already clear.
HoMerge
2025-09-18
Masonry walls of a single-family house built up to ground-floor height, without a roof. Window and door openings are visible in the newly erected walls.