Chronological progress of HoMerge construction works — foundations, walls, slabs.
HoMerge
2025-12-17
At the house construction site, the erected walls and wooden formwork with reinforcement for the ceiling are visible, and construction materials are stored at the top.
HoMerge
2025-12-17
A single-family house under construction: the ground-floor and first-floor walls are standing, formwork and reinforcement of the slab with supported beams are underway. Construction materials are lying on the site.
HoMerge
2025-12-17
A construction site with piles of earth and sand, bags, and pallets of materials. In the background, the raised walls and columns of a single-family house.
HoMerge
2025-12-17
House construction site: concrete walls and columns have been erected, scaffolding and building materials are visible. In the foreground there is a portable toilet and a mound of earth.
HoMerge
2025-12-17
Construction of the house walls is underway on the plot; raw masonry and structural elements are visible. In front of the construction there is a portable toilet and protruding reinforcement bars.
HoMerge
2026-02-04
Formwork and reinforcement of the slab supported by props; below, masonry walls of blocks and foundation walls are visible.
HoMerge
2026-02-04
House construction: ground-floor and part of the upper-floor walls have been built from blocks, and props and formwork for the floor slab have been set up.
HoMerge
2026-02-04
House construction: walls and columns are standing, the roof truss has been installed over part of it, materials stored on the ceiling; view from inside a car.
HoMerge
2026-02-04
View from a car of a house under construction: the walls and columns of the ground floor are up and the roof structure has begun. Window and entrance openings are visible.
HoMerge
2026-02-04
The raised walls and ceiling of the building are visible, as well as the prepared elements of the roof structure, with scaffolding and building materials set up around.
HoMerge
2026-03-06
A poured and trowelled foundation slab; the smooth concrete surface covers the entire footprint of the building. In the middle stands a small piece of construction equipment.
HoMerge
2026-03-06
Reinforcement mesh spread over the entire area under the future foundation slab, with protruding vertical reinforcement bars. View of the reinforcement preparation stage before concreting.
HoMerge
2026-03-06
Laid out steel reinforcement mesh under a house foundation slab, with visible edge formwork. Preparation for concreting.
HoMerge
2026-03-06
Top view of a freshly poured concrete slab, with wooden formwork, makeshift steps, and reinforcement alongside. This is the stage after the foundation slab pour.
HoMerge
2026-03-06
Reinforcement of the foundation slab with a laid rebar mesh and formwork around the perimeter, prepared for pouring concrete. A visible stage of foundation work.
HoMerge
2026-03-06
Over the entire area of the future foundation slab, a reinforcement mesh is laid on the formwork, ready for concreting.
HoMerge
2026-03-06
A dense reinforcing mesh laid out on the slab/plate with perimeter formwork; at the ends, workers are preparing the stage before concreting.
HoMerge
2026-03-06
Poured foundation slab with protruding reinforcement, prepared for further work; a ladder lies on the slab.
HoMerge
2026-03-10
The building’s walls have been erected from blocks; reinforcement and formwork for the ceiling are being installed at the top, with scaffolding visible.