Chronological progress of HoMerge construction works — foundations, walls, slabs.
HoMerge
2025-09-23
At the construction site, the prepared reinforcement and formwork for the foundations as well as the leveled ground are visible.
HoMerge
2025-09-23
Masonry foundation walls outlining the building footprint on the construction site. The stage of foundation construction is visible.
HoMerge
2025-09-25
Low block walls were erected, with a wooden roof truss mounted on them.
HoMerge
2025-09-26
A concrete foundation slab and partially built perimeter walls of the house, a view of an early stage of construction on a prepared plot.
HoMerge
2025-09-27
View from the car of the prepared construction plot with an excavation and piles of earth.
HoMerge
2025-10-01
On the plot there is a rectangular, newly made foundation slab with formwork; a construction site prepared for a house.
HoMerge
2025-10-01
At the house construction site, there are concrete columns and dense wooden formwork for the ceiling; the prepared ceiling and stacked planks are visible.
HoMerge
2025-10-01
Interior of the building after pouring the slab or floor, a concrete surface and structural columns are visible.
HoMerge
2025-10-01
An elevated wooden ceiling structure with visible beams and posts under the roof.
HoMerge
2025-10-06
Foundations with low block walls were built on the plot, outlining the footprint of the future house.
HoMerge
2025-10-08
Foundation slab of the house completed on the plot, visible reinforcement and installation openings.
HoMerge
2025-10-15
Block walls erected, formwork completed and the slab over the ground floor poured, with visible reinforcing bars.
HoMerge
2025-10-18
A poured slab on block walls; window openings and protruding reinforcing bars are visible.
HoMerge
2025-11-20
On the poured foundation slab, walls made of blocks are being erected; partially completed walls are visible. Pallets with building materials stand on the ceiling.
HoMerge
2025-11-21
View of house construction: on the concrete slab and basement walls, the ground-floor walls are being erected from hollow blocks. Masonry work is progressing around the building’s perimeter.
HoMerge
2025-11-24
Raised walls of blocks on the foundation, visible scaffolding and floor reinforcement during house construction.
HoMerge
2025-11-25
The ground-floor walls made of blocks have already been erected, with visible window openings. The masonry work for the higher storey and preparation for the floor slab have begun.
HoMerge
2025-11-25
At the house construction site, the block walls on the ground-floor level are erected, the basement ceiling and window openings are visible, workers are up above.
HoMerge
2025-11-25
The poured slab over the ground floor is supported by props, with sections of walls made of blocks erected on it. Formwork by the columns and scaffolding are also visible.